Bedrock
Login
For General Contractors onActive Jobs

Prevent weeks of rework.
Never miss a drawing change again.

Automated drawing comparisons that surface real scope changes —reducing RFIs, delays, and change order surprises.

How it works

From revisions to decisions in minutes

Upload. Review. Price. Same day.

From revisions to ROMs in hours, not weeks.

No credit card to start

Founders

Who are we?

We built automation tools at Notable that processed millions of healthcare documents to streamline patient access to care. Now we're solving the revision review problem that costs GCs weeks of rework on every project.

Kevin Huang, PhD

Stanford University
Notable Health

Stan Liu

UC Berkeley
Y CombinatorNotable Health

Change report

See what changed and what it costs

One report shows the full picture: changes by discipline, pricing impact, and who needs to act.

Project
Early Childhood Center Construction
Sheets & Overlays

S-102 · Structural Overlay
RTU support framing revised; CMU wall lintels added; roof elevations updated.
S-102 · Structural Overlay
13-A-103 · Architectural Overlay
Walkway stair removal at prefabricated aluminum cover area.
13-A-103 · Architectural Overlay
S-102 · Roof Plan
S-102 · Structural Overlay
Order of Magnitude Estimate
Low
$18k
Mid
$24k
High
$32k
Overview
The revisions to the S-102 Roof Plan primarily focus on structural modifications to the mechanical unit support framing, updates to various roof elevations, and the addition of specific structural lintel requirements for CMU walls. Former W10x54 beams and dunnage framing callouts have been replaced with W8x18 lintels. High Roof elevations adjusted by approximately 1 inch.
Drivers
  • Mechanical RTU framing revised from W8X28 beams to W8x18 lintels near grid lines B-C / 3-5.
  • New structural lintel specifications added for CMU walls near grid line G/1.
  • Roof elevation adjustments for High Roof high point and low point.
Next steps
  • Confirm RTU loading with mechanical contractor for revised W8x18 lintel configuration.
  • Coordinate CMU lintel installation with masonry contractor (HSS12x10x1/2 and W8x18).
  • Update steel shop drawings with revised framing members.